Supply and Installation of LT Motors

SC050260140-160 KW, 315L, B3, 1485 RPM, LT MOTOR,SC050260450-110KW, 3 PHASE, 4 POLE, FRAME-315M, V-

Goods
Qty:2

Tender Timeline

Tender Issue
June 5, 2025 at 12:26 PM

Tender Description

Tender Title: Supply and Installation of LT Motors

Tender Reference Number: bf9f9f32

Issuing Authority

Department: Materials Management
Ministry: Ministry of Coal

Scope of Work and Objectives

The objective of this tender is to procure and install LT (Low Tension) motors, specifically designed for various industrial applications within the Ministry of Coal's operations. The tender encompasses the supply of two distinct motor variants:

  1. SC050260140-160 KW, 315L, B3, 1485 RPM, LT MOTOR
  2. SC050260450-110KW, 3 PHASE, 4 POLE, FRAME-315M, V-1 MOUNTING/ VERTICAL, SQUIRREL CAGE INDUCTION MOTOR

General Information

Item Category
SC050260140-160 KW, 315L, B3, 1485 RPM, LT MOTOR , SC050260450-110KW, 3 PHASE, 4 POLE, FRAME-315M, V-1 MOUNTING/ VERTICAL, SQUIRREL CAGE INDUCTION MOTOR
Ministry Name
Department Name
Organisation Name

Financial Information

Bid Offer Validity
180 (Days)
Arbitration Clause
No
Mediation Clause
No

Evaluation and Technical Information

Evaluation Method
Item wise evaluation/
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Inspection Required
Yes
Technical Clarifications Time
3 Days

Tender Documents

6 Documents
GeM-Bidding-7927466.pdfMain Document
Other DocumentsOTHER
Other DocumentsOTHER
Other DocumentsOTHER
Buyer uploaded ATC documentATC ATC
GEM General Terms and Conditions DocumentGEM_GENERAL_TERMS_AND_CONDITIONS

Similar Tenders

View All

3 Phase Squirrel Cage Induction Motor Copper winding. KW- 0.37, HP- 0.5, Pole- 4, RPM- 1440, Frame

₹15,000.00
GEM
Goods
Qty:66
5 Files
Uranium Corporation Of India Limited
EAST SINGHBHUM, JHARKHAND
Boq › Boql
3 Phase Squirrel Cage Induction Motor Copper winding. KW- 0.37, HP- 0.5, Pole- 4, RPM- 1440, Frame size- 71 , 3 Phase Squirrel Cage Induction Motor Copper winding. KW- 0.37, HP- 0.5, Pole- 2, RPM- 2880, Frame size- 71 , 3 Phase Squirrel Cage Induction Motor Copper winding. KW- 0.75, HP- 1, Pole- 6, RPM- 1000, Frame size- 90 , 3 Phase Squirrel Cage Induction Motor Copper winding. KW- 0.75, HP- 1, Pole- 4, RPM- 1440, Frame size- 80 , 3 Phase Squirrel Cage Induction Motor Copper winding. KW- 0.75, HP- 1, Pole- 2, RPM- 3000, Frame size- 80 , 3 Phase Squirrel Cage Induction Motor Copper winding. KW- 1.5, HP- 2, Pole- 4, RPM- 1440, Frame size- 90 , 3 Phase Squirrel Cage Induction Motor Copper winding. KW- 1.5, HP- 2, Pole- 2, RPM- 3000, Frame size- 90 , 3 Phase Squirrel Cage Induction Motor Copper winding. KW- 2.2, HP- 3, Pole- 6, RPM- 1000, Frame size- 112 , 3 Phase Squirrel Cage Induction Motor Copper winding. KW- 2.2, HP- 3, Pole- 4, RPM- 1440, Frame size- 100 , 3 Phase Squirrel Cage Induction Motor Copper winding. KW- 2.2, HP- 3, Pole- 2, RPM- 2880, Frame size- 90L , 3 Phase Squirrel Cage Induction Motor Copper winding. KW- 3.7, HP- 5, Pole- 6, RPM- 1000, Frame size- 132 , 3 Phase Squirrel Cage Induction Motor Copper winding. KW- 3.7, HP- 5, Pole- 4, RPM- 1440, Frame size- 112 , 3 Phase Squirrel Cage Induction Motor Copper winding. KW- 3.7, HP- 5, Pole- 2, RPM- 3000, Frame size- 100L , 3 Phase Squirrel Cage Induction Motor Copper winding. KW- 5.5, HP- 7.5, Pole- 6, RPM- 1000, Frame size- 132 , 3 Phase Squirrel Cage Induction Motor Copper winding. KW- 5.5, HP- 7.5, Pole- 4, RPM- 1500, Frame size- 132 , 3 Phase Squirrel Cage Induction Motor Copper winding. KW- 5.5, HP- 7.5, Pole- 2, RPM- 3000, Frame size- 132
May 29, 2025
June 19, 2025 at 3:00 PM
View Details

Frequently Asked Questions

The eligibility requirements include being a registered entity, demonstrating previous experience supplying and installing similar low tension motors, and ensuring compliance with relevant government regulations. Bidders must show validated credentials and capability to meet technical specifications.

Bidders must submit a valid registration certificate, quality compliance certifications relevant to the supply of LT motors, and any additional documentation requested in the tender. Ensuring these required certificates are submitted accurately is crucial for bid acceptance.

Bidders must first register online on the designated government procurement platform. After registration, they can access the tender documents, submit technical and financial bids, and provide the necessary documentation as specified. Understanding the registration process is essential for seamless participation.

Successful bidders will be required to submit a performance security deposit following the award of the contract. This deposit serves to ensure the fulfillment of contractual obligations and is generally a percentage of the contract value, safeguarding the issuing authority against any defaults.

MSEs benefit from special provisions within this tender, designed to encourage their participation in government contracts. This includes relaxation on eligibility criteria, potential access to preferential treatment during bid evaluations, and alignment with Make in India initiatives promoting local production and sourcing practices.

Probable Bidders

Companies likely to bid

Get Tender Alerts

Get notifications for similar tenders