Government Tender for Line Shifting Work: Replacement of H-Frame Towers on 66kV Line

Work of Replacement of H-Frame by tower (Line Shifting Work) of 66Kv Jetpur Panchpipada tap to Jetpur A Line with ACSR Dog Conductor between existing Location No. 49 to 53/27 approved under R&M 2025-26 under AM Division Dhoraji under Junagadh Circle (With buyback of OLM)

Type: Works
Fee: ₹1,180
Est: ₹14.4 Lakh
Period: 2  Months

Tender Details

  • 66kv Zanzarada S/S Campus, Opp. Nandarayji Gaushala, Dhandhusar Road, Zanzarada Junagadh.
  • Submission Start:May 12, 2025 at 06:15 PM
  • Document Download End:June 3, 2025 at 04:00 PM
  • setrjunagadh.getco@gebmail.com
Industry: Power and Energy
Category: Works
Type: Works
Est:14.4 Lakh
Period: 2  Months

This government tender offers an exclusive opportunity for experienced electrical contractors to participate in the replacement of H-Frame towers and line shifting on a 66kV power transmission line in Junagadh, Gujarat. Managed by Gujarat Energy Transmission Corporation Limited (GETCO), the project aims to enhance the reliability and efficiency of power transmission infrastructure. The scope includes tower removal, erection, conductor stringing, and testing, with a strict timeline of 2 months. Bidders must meet specific eligibility criteria, including technical expertise, financial stability, and valid licenses. The tender process involves transparent evaluation based on technical competence, experience, and price competitiveness. The project provides a significant contribution to Gujarat’s power sector development, offering a lucrative opportunity for qualified electrical firms to showcase their capabilities and support regional power infrastructure growth.

Overview

This government tender invites qualified electrical contractors to undertake line shifting and tower replacement work on a 66kV power transmission line in Junagadh, Gujarat. The project involves replacing H-Frame towers with new towers along the existing line route between Location No. 49 to 53/27, as part of the R&M 2025-26 program under GETCO. The scope includes line shifting, tower installation, and associated electrical works, with a completion period of 2 months. The tender aims to enhance power transmission reliability and efficiency in the region. The project is managed by Gujarat Energy Transmission Corporation Limited (GETCO), a key player in power infrastructure development. Bidders must meet specific eligibility criteria, including technical and financial capabilities, and submit all required documents within the stipulated deadline. The tender process is transparent, with clear evaluation criteria, and offers an excellent opportunity for experienced electrical firms to contribute to Gujarat’s power sector infrastructure.

Scope of Work

The scope of work includes:

  • Replacement of existing H-Frame towers with new towers at designated locations.
  • Line shifting activities to facilitate tower installation and maintenance.
  • Installation of ACSR Dog Conductor along the specified line route.
  • Ensuring safety and compliance with all electrical standards and regulations.

The process involves:

  1. Site assessment and preparation at designated locations.
  2. Removal of existing towers as per technical specifications.
  3. Erection of new towers ensuring structural integrity.
  4. Stringing of conductors and testing for proper electrical connectivity.
  5. Final inspection and commissioning of the line.
SpecificationDetails
Line Voltage66kV
Conductor TypeACSR Dog
Tower TypeH-Frame replaced by towers
Completion Period2 months
All work must adhere to safety standards, environmental regulations, and GETCO’s technical guidelines. The contractor shall coordinate with GETCO officials for site access and inspection. Proper documentation, including work certificates and safety compliance reports, must be maintained throughout the project.

Eligibility Criteria

Bidders must meet the following eligibility criteria:

  • ✓ Must have valid registration with GETCO or equivalent authority.
  • ✓ Proven experience in electrical transmission line works, specifically tower replacement and line shifting.
  • ✓ Financial capability with IT returns of the last three years demonstrating stability.
  • ✓ Bank solvency of at least 20% of the estimated tender value.
  • ✓ Valid electrical contractor license.
  • ✓ GST registration and PAN card.
  • ✓ Adequate tools, tackles, and safety equipment.
  • ✓ Experience certificates for similar projects completed in the last 5 years.
  • ✓ Submission of all required documents as per tender guidelines, including experience certificates, financial statements, partnership deeds if applicable, and undertaking of NCLT insolvency declarations if any.
Qualification CriteriaMinimum Requirement
RegistrationValid GETCO registration or equivalent
ExperienceAt least 3 similar projects in last 5 years
FinancialsIT returns of last 3 years, net worth positive
Technical CapabilityAdequate tools and electrical licenses
Financial SolvencyBank solvency of 20% of estimated cost
Failure to meet any of these criteria may result in disqualification.

Technical Specifications

The technical specifications for the project include:

ParameterSpecification
Line Voltage66kV
ConductorACSR Dog
Tower TypeH-Frame towers replaced with new towers
MaterialHigh-quality galvanized steel for towers
Line LengthAs per Location No. 49 to 53/27
Installation StandardsAs per Indian Electricity Rules and GETCO guidelines
The process involves: - **Preparation of site** with safety measures. - **Removal of existing towers** with minimal disruption. - **Erection of new towers** ensuring alignment and stability. - **Stringing conductors** with proper tensioning. - **Electrical testing** and commissioning.

All work must comply with technical standards, safety protocols, and environmental regulations. Use of approved materials and adherence to project timelines are mandatory.

Financial Requirements

The estimated project cost is approximately ₹14,36,086.47, with a bid security (EMD) of ₹15,297. Bidders must submit a detailed financial proposal, including breakdowns for materials, labor, and miscellaneous expenses. Payment terms are linked to project milestones, with an initial mobilization advance permissible upon agreement. The tender includes:

Cost ComponentAmount
Estimated Cost₹14,36,086.47
Bid Security (EMD)₹15,297
Payment Schedule30% advance, 40% on midway, 30% on completion
All financial transactions must be supported by valid invoices and receipts. The bidder’s financial capability will be assessed based on IT returns, net worth, and liquidity certificates submitted during bid evaluation.

Bidding Process

The bidding process involves the following steps:

  1. Download tender documents from the official portal before the deadline.
  2. Submit the technical bid with all required documents, including EMD and tender fee.
  3. Technical bid opening and evaluation by GETCO officials.
  4. Shortlisting of qualified bidders based on eligibility criteria.
  5. Financial bid opening for shortlisted bidders.
  6. Evaluation of financial proposals and final selection.
TimelineEvent
Bid submission start12-05-2025 18:15
Bid submission end03-06-2025 16:00
Tender openingPost bid closing date
**Important:** Bidders must ensure all documents are complete and submitted before the deadline. Late submissions will be rejected.

Evaluation Criteria

Evaluation of bids will be based on:

CriteriaWeightage
Technical competence40%
Financial capacity30%
Experience in similar projects20%
Price competitiveness10%
Minimum qualifying marks are set at 50% for technical evaluation. Bidders must score above this threshold to qualify for financial evaluation. The final award will be based on the combined score, with technical competence and financial stability being key factors. The evaluation committee’s decision will be final and binding.

Important Dates

DateEventDetails
12-05-2025Bid startBidders can download tender documents and submit bids
03-06-2025Bid endLast date for bid submission at 16:00 hours
04-06-2025Technical bid openingBids will be opened and evaluated
To be notifiedPrice bid openingShortlisted bidders will be invited
10-06-2025Award announcementFinal decision communicated
**Note:** All deadlines are strict; late submissions will not be entertained.

Contact Information

For any queries or clarifications, bidders can contact:

| Name | Superintending Engineer (TR) |
| Department | Gujarat Energy Transmission Corporation Limited, Junagadh |
| Email | setrjunagadh.getco@gebmail.com |
| Address | 66kv Zanzarada S/S Campus, Opp. Nandarayji Gaushala, Dhandhusar Road, Zanzarada, Junagadh |
| Phone | [Not provided, email preferred] |

Bidders are advised to communicate well in advance of the deadline for any clarifications or document submissions.

Additional Information

All bidders must ensure compliance with the latest technical and safety standards specified by GETCO. The tender process is transparent, and all updates will be posted on the official portal. Bidders are encouraged to review all documents carefully, including the linked tender document available here. The successful bidder will be required to sign a contract and adhere to all contractual obligations, including safety, quality, and timely completion of the project.

Industry & Sector Information

Primary Industry

Power and Energy

Sectors

Power and Energy

Related Industries

Electrical Infrastructure
Transmission Line Projects
Public Sector Contracts

Target Audience

Electrical contracting companies
Power infrastructure firms
Transmission line specialists
Electrical engineering consultants
Construction contractors with experience in electrical projects

General Information

Item Category
Electrical Works
State

Financial Information

Estimated Bid Value
₹14,36,086.50
EMD Amount
₹15,297.00
Bid Offer Validity
180 Days

Evaluation and Technical Information

Inspection Required
No

Tender Documents

1 Document
TCJND-2025-26-N-16 for Shifting of 66Kv Jetpur Panchpipla.pdfTENDER_DOCUMENT

Tender Stages

Tender Stages

stage nameminimum forms for submission
Technical Bid0
Price Bid0

Frequently Asked Questions

The last date for bid submission is 03-06-2025 at 16:00 hours. Bidders must ensure all documents are uploaded and submitted before this deadline to avoid disqualification.

Bidders must have valid GETCO registration, experience in similar electrical transmission projects, sufficient financial stability demonstrated through IT returns, and valid electrical licenses. They must also submit all required documents, including EMD, tender fee, experience certificates, and financial statements.

Bids are evaluated based on technical competence (40%), financial capacity (30%), experience (20%), and price competitiveness (10%). Minimum qualifying marks are 50% for technical evaluation, and the final selection is based on the combined score.

Key documents include RTGS/NEFT payment receipts, experience certificates, registration proof, bank solvency, GST registration, PAN card, IT returns, tools list, electrical license, and signed copies of integrity pact and tender documents.

For queries, contact Superintending Engineer (TR), GETCO, Junagadh at setrjunagadh.getco@gebmail.com. It is recommended to communicate well in advance of the deadline for clarifications or document submission.

Probable Bidders

Companies likely to bid

Get Tender Alerts

Get notifications for similar tenders