Scope of Work and Objectives - COAL INDIA LIMITED - Coal India Limited

SUPPLY INSTALLATION OF 200 GPM C. I. HORIZONTAL SPLIT CENTRIFUGAL PUMP SET AND ACCESORIES, 100 M HE

Goods
Qty:2
EMD: ₹23,781

Tender Timeline

Tender Issue
May 19, 2025 at 4:52 PM
Corrigendum
May 30, 2025 at 10:36 AM
New Document Added Download

The abaf617e tender is issued by Coal India Limited, under the Ministry of Coal, for the purpose of procuring and installing advanced pumping systems. The scope of work involves the Supply Installation of 200 GPM C.I. Horizontal Split Centrifugal Pump Set and Accessories, designed for 100 meters of head. This project aims to enhance hydraulic operations within coal mining and associated activities.

Scope of Work and Objectives

The primary objective of this tender is to engage a competent vendor for the supply and installation of two units of 200 GPM centrifugal pump sets, which must meet specified technical and operational criteria. The successful bid will empower the Coal India Limited operations by ensuring effective water management, which is critical in coal mining. The successful contractor will be responsible for the complete installation along with required accessories ensuring optimal performance and compliance with operational standards.

Eligibility Criteria

Eligible vendors must be registered legal entities capable of executing this type of work. Key eligibility requirements include:

  • Proven experience in similar installations, specifically involving centrifugal pumps.
  • Appropriate licensing and registration.
  • Financial viability to undertake the project successfully.

Technical Requirements

The technical requirements encompass:

  • The centrifugal pump sets must conform to industry standards and demonstrate efficiency in operation.
  • Compliance with local safety and environmental regulations.
  • All equipment should come with warranties covering performance and manufacturing faults.
  • Installation must be done by qualified technicians familiar with hydraulic engineering concepts.

Financial Requirements

Bidders must demonstrate financial stability, which may include:

  • Submission of previous work contracts that reflect financial health.
  • Detailed cost breakdown and a clear pricing strategy for the installation and any additional accessories required.
  • Any anticipated costs must align with expected budgetary allocations.

Document Submission Details

All proposals must be submitted electronically through the GEM platform adhering to set formats and guidelines. The documents required for submission include:

  • Technical proposal detailing compliance with the specifications.
  • Financial proposal illustrating cost allocation.
  • Relevant certificates proving eligibility as per the stated criteria.

Special Provisions

This tender encourages participation from Micro, Small, and Medium Enterprises (MSEs) and startups. Benefits include preferential treatment in the bid evaluation process, enabling new firms to compete effectively.

Evaluation Process

The evaluation of bids will focus on the completeness of documentation, compliance with technical specifications, and financial viability. Bids will be assessed based on the lowest financial proposal alongside the capability to deliver high-quality work.

Delivery Locations

The successful bidder will need to coordinate the delivery and installation of equipment at designated Coal India operational sites determined during the final contractual agreement.

Contact Information

For specific inquiries related to this tender, prospective bidders are encouraged to reach out through the GEM platform or the contact channels specified within the tender documentation.


General Information

Item Category
SUPPLY INSTALLATION OF 200 GPM C. I. HORIZONTAL SPLIT CENTRIFUGAL PUMP SET AND ACCESORIES, 100 M HEAD
Ministry Name
Department Name
Organisation Name
State

Financial Information

EMD Amount
₹23,781.00
Bid Offer Validity
120 (Days)
Past Performance
50 %
Arbitration Clause
No
Mediation Clause
No

Evaluation and Technical Information

Evaluation Method
Total value wise evaluation
Inspection Required
Yes
Technical Clarifications Time
7 Days

Tender Documents

3 Documents
GeM-Bidding-7848088.pdfMain Document
Other DocumentsOTHER
GEM General Terms and Conditions DocumentGEM_GENERAL_TERMS_AND_CONDITIONS

Documents Required from Seller

  • Experience Criteria
  • Past Performance
  • Certificate (Requested in ATC)
  • OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria
  • the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

Bid Extended to June 17, 2025 at 11:00 AMModified on May 30, 2025 at 10:19 AM
Bid Opening June 17, 2025 at 11:30 AM

Similar Tenders

View All

a GASKET WATER INLET TO BLOCK,b GASKET PUMP SUPPORT TO BLOCK,c GASKET VALVE LEVER CASING TO CYL HEA

GEM
Goods
Qty:4,710
4 Files
Rites Limited
DURG, CHHATTISGARH
Boq › Boql
a GASKET WATER INLET TO BLOCK , b GASKET PUMP SUPPORT TO BLOCK , c GASKET VALVE LEVER CASING TO CYL HEAD , d DRESSER COUPLING GASKET2 point 1by2 , e O RING FOR FUEL PUMPING , f O RING EXPRESSOR LUBE OIL PUMP , g GASKET WATER JUMPER PIPE Bottom , h ARMOURED GASKET WITHOUT STEEL , I ARMOURED GASKET , j A9 RUBBER VALVE RUBBER KIT , k SA9 INDEPENDENT BRAKE VALVE RUBBER KIT , l C2 RELAY VALVE RUBBER KIT , m GASKET FOR CYLINDER LINER , n DRESSOR GASKET 2 , o ARMOURED GASKET 2point5 , p GORMET FOR FIP SUPPORTY COVER , q GASKET TAPPET COVER CASING VALVE LEVER , r GASKET WATER PIPE TO WATER COLLECTOR , s GASKET PHASING PLATE , t GASKET FUEL PRIMARY and SECONDARY , u GASKET LUBE OIL STRAINER COVER , v GASKET LUBE OIL STRAINER COVER , w WATER JUMPER TOP GASKET , x RUBBER ROLLER , y GORMET PUSH ROD SLEEVE , z GASKET BASE COVER TO GENRATOR END , aa SEAL O RING , ab GASKET PIPE TO PUMP and LUBE OIL COOLER , ac GASKET REGULATINGVALVE TO BASE , ad GASKET BODY TO SPRING HOUSING , ae GASKET PIPE TO STRAINER , af GASKET COVER TO HOUSING , ag GASKET PUMP TO PLATE and BASE , ah GASKET SHIM TO HOUSING and CYL HEAD , ai GASKET , aj GASKET SUPPORT TO BASE LEFT SIDE , ak GASKET SUPPORT TO BASE RIGHT SIDE , al GASKET COUPLING , am GASKET VALVE TO PIPE , an GASKET AT PIPE and BELOW CONNECTORS , ao GASKET FAN DRIVE TO SUPPORT , ap GASKET FITTING TO FAN DRIVE , aq GASKET ELBOW TO AFTER COOLER , ar GASKET AIR ELBOW TURBO , as GASKET HOUSING TO SUPPORT , at GASKET CYLINDER BLOCK TO TURBO SUPPORT , au GASKET CYLINDER BLOCK TO GEAR CASING FREE END LOWER , av GASKET ARMOURED , aw GASKET ARMOURED , ax GASKET ARMOURED , ay GASKET WATER CONNECTOR , az GASKET FUEL OIL PUMP FACE PLATE , aaa GASKET FLEX COUPLING 3 , aab VICTAULIC GASKET 3 , aac GASKET FOR BEARING HOUSING TACHO GEN
May 15, 2025
June 3, 2025 at 10:00 AM
View Details

Frequently Asked Questions

The eligibility requirements include being a registered entity capable of executing installations involving centrifugal pumps. Interested vendors must demonstrate previous installation experience, hold the necessary licenses, and showcase financial stability. All bidders must comply with the existing regulatory frameworks applicable to the mining and construction industries.

Vendors must submit various certificates at application, including technical and financial certification proving competency in installation projects, as well as certifications for health, safety, and environmental compliance. These certificates ensure that bidders adhere to required industry standards and regulations.

Bidders must register on the GEM platform to participate in this tender. Registration involves submitting the required documentation, completing an application form, and adhering to the digital submission guidelines. Following registration, bidders can access available tenders and submit their proposals.

All documents related to the tender submission must be uploaded in specified formats, typically including PDF and Excel formats. It’s crucial that submissions align with the guidelines provided on the GEM platform to avoid rejection due to technical discrepancies.

Payment terms will typically include an upfront mobilization advance followed by milestone payments upon successful completion of installation phases. Additionally, a performance security may be required to ensure compliance with contract terms. Detailed payment structures will be specified within contract agreements post-bid acceptance.

Probable Bidders

Companies likely to bid

Get Tender Alerts

Get notifications for similar tenders