Tender Timeline
Tender Title: Supply of Forklifts (V2)
Tender Reference Number: GEM/2024/B/5626073
Issuing Authority/Department: Department of Atomic Energy
Organization Name: Nuclear Power Corporation Of India Limited
Scope of Work and Objectives
The tender aims to procure Forklifts (V2) as per IS 6765:2003 and IS 10517 standards. The objective is to enhance operational efficiencies at the Kakrapar Gujarat Site by equipping the site with necessary material handling equipment. The successful bidder will be responsible for supplying the forklifts, ensuring compliance with all specifications outlined in the tender documentation, and delivering the items within the stipulated timeframe. This procurement aligns with operational needs that require reliable and efficient forklifts for handling various lifting tasks within the facility.
Key Dates
- Bid End Date: January 10, 2025, 11:00 AM
- Bid Opening Date: January 10, 2025, 11:30 AM
- Bid Offer Validity: 120 days from the bid end date
- Technical Clarifications Period: 7 days during technical evaluation
Eligibility Criteria
- Bidders must comply with the specifications outlined in the tender documents, including having valid certification as per the required IS Standards.
- Manufacturers or OEMs offering products must provide evidence of local content as required under the Make in India policies.
- Micro, Small, and Medium Enterprises (MSEs) must possess valid Udyam Registration for eligibility to bid.
Technical Requirements
- Forklift operating mode: Diesel Engine Operated
- Tonnage Capacity: 5 tons
- Dimensions and specifications such as lifting height, tyre types, number of cylinders, and maximum engine torque must meet the outlined requirements in the tender documents.
- Successful bidders must provide a warranty of at least 1 year or 2,000 working hours.
- The bidder should also ensure that all additional mandatory spares as specified in the documentation are supplied along with the forklift.
Financial Requirements
- An Earnest Money Deposit (EMD) of INR 50,000 is required.
- Performance Security will be 5% of the total contract value.
- Payments will be subject to conditions outlined in the tender, including applicable GST.
Document Submission Details
Bidders must submit the following documents along with their bid:
- Technical bid covering compliance with specifications.
- Financial bid indicating pricing.
- Scanned copies of EMD payment proof.
- Valid certificates supporting claims of local content and Udyam registration if applicable.
- Any other required documents as per the tender.
Special Provisions
- MSE and Startup Benefits: MSEs will receive considerations for pricing if they fall within the specified margin of the lowest quoted price.
- Bidders must prepare to comply with the Make in India procurement policies, emphasizing the importance of locally sourced materials.
Evaluation Process
The evaluation will be conducted based on total value-wise criteria, considering both the technical and financial aspects of the bids. Technical compliance must be met to proceed to the financial evaluation phase. Bidders will be notified of the results following the bid opening.
Delivery Locations
Bidders shall deliver the forklifts to the Kakrapar Gujarat Site, PO Anumala, District Tapi, Gujarat 394651. Delivery must be completed within 90 days from the date of contract award.
Contact Information
For any clarifications, bidders are encouraged to reach out via the contact details provided in the main tender document. It is important for bidders to address all queries during the specified technical clarification period.
General Information
Financial Information
Evaluation and Technical Information
Tender Documents
5 DocumentsCorrigendum Updates
Similar Tenders
Frequently Asked Questions
Details are provided in the tender document.
A1: To be eligible for the tender, bidders must meet the technical specifications specified in the tender document and provide valid certifications as required. Additionally, micro, small, and medium enterprises (MSEs) must have current Udyam registrations.
A2: Bidders must submit a technical bid, financial bid detailing pricing, proof of EMD payment, and any necessary certificates regarding local content and Udyam registration. All required documents are outlined in the tender documentation.
A3: The forklifts must have a 5-ton capacity, operate on diesel, and comply with specific dimensions such as a maximum engine torque, cylinder count, and required warranty periods. Detailed specifications can be found in the tender.
A4: The EMD required is INR 50,000. Bidders must provide proof of this payment with their submitted documents.
A5: Bidders must include the EMD and can be required to submit a performance security of 5% of the total contract value, along with pricing as per GST standards.
A6: Yes, MSEs are eligible for purchase preferences, and if they meet specific criteria, they may have opportunities to match prices with the lowest bidder.
A7: The bid evaluation will include checking technical compliance first, followed by evaluating financial offers. Bidders who meet the technical requirements will have their financial bids assessed.
A8: Yes, bidders can submit the EMD through various means including Demand Draft, Fixed Deposit, or online payment methods. Specific submission details are available in the documentation.
A9: Bids must be submitted by January 10, 2025, at 11:00 AM. Ensure that all required documents are uploaded on the GeM portal before this time.
A10: The successful bidder must deliver the forklifts to the specified location within 90 days from the date of contract award.
A11: Bidders are advised to calculate and break down the applicable GST on their own and should only submit the percentage without mixing it with price details in the technical bid.
A12: Yes, bidders are expected to provide additional mandatory spares as outlined in the tender, and pricing for these must be included in the bid.
A13: Failure to meet the delivery timeline can lead to penalties, including potential termination of the contract, as specified in the terms of the tender.
A14: Yes, there is a 7-day period allowed for technical clarifications during the evaluation of the bids. Bidders can address any queries they have during this period.
A15: Bidders should refer to the contact details in the tender documentation for any inquiries or further information needed about the tender process.
Probable Bidders
Get Tender Alerts
Get notifications for similar tenders