Government Tender for Electrical Works: HT/LT Line & Transformer Center Maintenance
Erection, Dismantling and Maintenance of HT/LT Line and Transformer center at Vasad S/dn and Any other S/Dn under Borsad Division office area.
Tender Details
- MGVCL Division Office, Nr. Vasad Chokdi, Opp. Court Compound, Borsad-388540
- Submission Start:June 5, 2025 at 02:00 PM
- Document Download End:June 27, 2025 at 02:00 PM
- ee.borsad.mgvcl@gebmail.com
This government tender offers a significant opportunity for electrical contractors specializing in power distribution infrastructure. The project involves erection, dismantling, and maintenance of HT/LT lines and transformer centers within the Borsad Division area. With a project duration of 12 months and an estimated cost of approximately ₹24.99 lakh, bidders must meet specific eligibility criteria, submit detailed technical and financial proposals, and adhere to safety and quality standards. The tender process is open to experienced firms with proven capabilities in power infrastructure projects. Download the detailed tender documents, prepare your bid, and participate in this transparent procurement process to contribute to reliable electricity supply in the region.
Overview
This government tender invites qualified electrical contractors to undertake the erection, dismantling, and maintenance of HT/LT power lines and transformer centers within the Borsad Division area. The project aims to enhance power distribution infrastructure at Vasad S/dn and other substations under Borsad Division Office. The scope includes installation, repair, and routine maintenance of high and low tension power lines, along with transformer center upkeep to ensure reliable electricity supply. The project duration is 12 months, with a total estimated cost of approximately 24.99 lakh INR. Bidders must adhere to specified eligibility criteria, submit required documents, and comply with technical and commercial specifications. The tender process is open to experienced electrical firms with valid certifications, and the evaluation will prioritize technical competence and cost-effectiveness. This opportunity is ideal for electrical contractors specializing in power distribution infrastructure, seeking government projects with clear scope and detailed guidelines.
Scope of Work
The scope of work includes:
- Erection, dismantling, and maintenance of HT/LT power lines within the designated area.
- Installation and upkeep of transformer centers to ensure efficient power distribution.
- Routine inspection and preventive maintenance of existing electrical infrastructure.
- Troubleshooting and repair of power lines and transformer centers as required.
- Compliance with safety standards and government regulations.
The process involves:
- Site assessment and planning.
- Procurement of materials and equipment.
- Execution of erection/dismantling activities.
- Regular maintenance and troubleshooting.
- Final inspection and handover.
Item | Specification |
---|---|
Power Line Voltage | HT and LT lines |
Transformer Capacity | As per site requirement |
Maintenance Frequency | Monthly and as needed |
Eligibility Criteria
✓ Must have valid electrical contractor license and relevant certifications.
✓ Proven experience in power line erection, dismantling, and maintenance.
✓ Financial stability with minimum annual turnover of ₹25 lakh for the last 3 years.
✓ Submit all required documents as specified:
Document | Description |
---|---|
Technical Bid | Proof of technical capability and experience |
Tender Fee & EMD | Non-refundable fee of ₹1770 and EMD of ₹25,000 |
Certification | Valid electrical safety and quality certifications |
Technical Specifications
Technical parameters include:
Parameter | Requirement |
---|---|
Power Line Voltage | HT (High Tension) and LT (Low Tension) |
Transformer Capacity | As per site-specific load requirements |
Material Standards | IS standards for conductors, insulators, and transformers |
Safety Measures | Compliance with electrical safety norms |
- Conduct site survey.
- Prepare detailed work plan.
- Procure approved materials.
- Execute erection/dismantling activities.
- Perform routine maintenance.
- Complete final inspection and documentation.
Financial Requirements
The estimated project cost is approximately ₹24,99,990.00. Payment will be made in installments based on milestones achieved, including:
Payment Stage | Amount | Conditions |
---|---|---|
Initial | 20% | Submission of work plan and safety plan |
Mid-term | 50% | Completion of erection and initial testing |
Final | 30% | Successful commissioning and handover |
Bidding Process
The bidding process involves:
- Registration and download of tender documents from the official portal.
- Submission of bid including technical and commercial proposals before the deadline.
- Bid opening conducted by the designated authority.
- Evaluation based on predefined criteria.
- Awarding of contract to the successful bidder.
Timeline | Event | Details |
---|---|---|
05-06-2025 | Bid Submission Start | Bidders can submit proposals from this date |
27-06-2025 | Bid Submission End | Last date for bid submission |
30-06-2025 | Evaluation & Opening | Preliminary evaluation and opening |
Evaluation Criteria
Evaluation will be based on:
Criteria | Weightage |
---|---|
Technical competence and experience | 50% |
Financial proposal | 30% |
Past project performance | 20% |
Important Dates
Date | Event | Details |
---|---|---|
05-06-2025 | Tender Notice Release | Start of bid submission |
27-06-2025 | Bid Submission Deadline | Last date for submitting bids |
30-06-2025 | Evaluation & Opening | Technical and financial evaluation |
05-07-2025 | Award Notification | Contract award announcement |
15-07-2025 | Contract Signing | Final agreement signing |
Contact Information
For inquiries and further details, contact:
| Contact Person | Ex. Engineer, MGVCL Borsad Division |
| Email | ee.borsad.mgvcl@gebmail.com |
| Phone | 9925208265 |
| Address | MGVCL Division Office, Nr. Vasad Chokdi, Opp. Court Compound, Borsad-388540 |
Bidders are encouraged to clarify doubts before submission to ensure compliance with tender requirements.
Additional Information
All bidders must review the detailed tender documents available for download. Ensure compliance with all safety, technical, and financial norms. The project aims to strengthen power distribution infrastructure, contributing to reliable electricity supply in the region. Participation is open to qualified electrical contractors with proven experience in similar projects. The tender process emphasizes transparency, fairness, and adherence to government procurement policies.
Industry & Sector Information
Primary Industry
Sectors
Related Industries
Target Audience
Tender Documents
4 DocumentsTender Stages
Tender Stages
stage name | evaluation date | minimum forms for submission |
---|---|---|
Preliminary | 30-06-2025 11:00 | 0 |
Commercial | 0 |
Similar Tenders
Frequently Asked Questions
The scope includes erection, dismantling, and maintenance of HT/LT power lines and installation and upkeep of transformer centers within Borsad Division. Tasks involve routine inspections, repairs, and safety compliance to ensure reliable power distribution over a 12-month period.
Bidders must possess valid electrical contractor licenses, demonstrate experience in power line projects, and have a minimum annual turnover of ₹25 lakh. Submission of technical documents, safety certifications, and financial proof is mandatory for qualification.
Register on the official portal, download tender documents, and submit your technical and commercial proposals before the deadline of 27th June 2025. Ensure all required documents, including EMD of ₹25,000, are submitted as per instructions.
All work must conform to IS standards for electrical materials and safety norms. The project involves installation of HT and LT lines, transformer centers, and routine maintenance, with adherence to safety protocols and quality benchmarks specified in the tender documents.
The estimated cost is ₹24,99,990. Payment will be made in three installments: 20% after initial work approval, 50% upon completion of erection, and 30% after successful commissioning, based on milestones achieved.
Probable Bidders
Get Tender Alerts
Get notifications for similar tenders