Government Tender for Retrofit Emission Control Device (RECD) Installation at GSPC LNG Terminal, Mundra

DESIGN, ENGINEERING, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF RETROFIT EMISSION CONTROL DEVICE (RECD) FOR EDG AT GSPC LNG TERMINAL, MUNDRA

Type: Works
Fee: ₹2,000
Period: As per tender Document Attached

Tender Details

  • GSPC LNG Limited, B-103, 1st floor, IT Tower 2, Infocity, Gandhinagar 382009
  • Submission Start:May 31, 2025 at 02:00 PM
  • Document Download End:July 30, 2025 at 05:00 PM
  • sanjaysengupta@gspc.in
Industry: Environmental Engineering & Infrastructure
Category: Works
Type: Works
Period: As per tender Document Attached

This government tender offers a unique opportunity for experienced EPC contractors to participate in the design, supply, installation, and commissioning of Retrofit Emission Control Devices (RECD) at the GSPC LNG Terminal in Mundra, Gujarat. The project aims to improve environmental standards by installing advanced emission control systems compliant with national and state regulations. Bidders must meet strict eligibility criteria, submit technical and financial proposals, and adhere to the specified timelines. The tender process involves multiple evaluation stages, emphasizing technical competence and cost-effectiveness. With a project value estimated between Rs. 2 crore and Rs. 3 crore, this project supports environmental sustainability and infrastructure development in the LNG sector. The tender is open to qualified EPC firms, environmental technology providers, and engineering consultants specializing in emission control solutions for large industrial facilities.

Overview

This government tender invites qualified contractors and engineering firms to participate in the comprehensive project for the design, engineering, supply, installation, testing, and commissioning of Retrofit Emission Control Devices (RECD) at the GSPC LNG Terminal in Mundra, Gujarat. The project aims to enhance emission standards and environmental compliance at the LNG terminal. The tender is issued by GSPC LNG Limited, a prominent public sector undertaking in Gujarat, under the sector category of Public Sector Undertakings & Joint Ventures. The scope includes detailed engineering, procurement of equipment, on-site erection, and final commissioning, with a completion period as per the tender document. Bidders must meet stringent eligibility criteria, including submission of bid fees, EMD, and technical documentation. The tender process involves multiple stages, with evaluation based on technical and financial parameters. The project offers an excellent opportunity for experienced EPC contractors specializing in emission control solutions and LNG infrastructure upgrades.

Scope of Work

The scope of work encompasses the following key activities:

  • Design and engineering of Retrofit Emission Control Devices (RECD) tailored for the GSPC LNG terminal.
  • Supply of all necessary equipment and materials as per technical specifications.
  • Installation and erection of emission control devices on existing equipment.
  • Testing and commissioning to ensure operational efficiency and compliance with environmental standards.

The process includes:

  1. Review of civil and mechanical drawings provided in the tender documents.
  2. Procurement of emission control systems and associated components.
  3. On-site installation adhering to safety and quality standards.
  4. Performance testing and final commissioning.
  5. Providing operational training and documentation.

The project timeline and detailed technical specifications are outlined in the tender documents, which bidders must review thoroughly before submission.

SpecificationDetails
Equipment TypeRetrofit Emission Control Devices
CapacityAs per existing EDG specifications
Compliance StandardsEnvironment Protection Act & Gujarat State norms
Installation SiteGSPC LNG Terminal, Mundra
Completion PeriodAs specified in the tender document
Bidders are required to ensure all activities meet the specified standards and safety regulations.

Eligibility Criteria

  • ✓ Must have valid bid processing fee and EMD submitted as per tender requirements.
  • ✓ Proven experience in designing, supplying, and installing emission control systems, particularly for LNG or similar industrial facilities.
  • ✓ Must possess relevant certifications and technical qualifications.
  • ✓ Financial stability evidenced by turnover and financial documents.
  • ✓ Must submit all required documents, including bid fee proof, EMD proof, technical qualification documents, and any other specified certificates.
Qualification CriteriaMinimum Requirement
TurnoverRs. [specified amount] for last 3 years
ExperienceMinimum [X] years in emission control projects
CertificationsValid ISO, ISO 9001, and environmental standards
FinancialsAudited financial statements for last 3 years
**Note:** Bidders must meet all the above criteria to qualify for technical evaluation and subsequent stages.

Technical Specifications

The technical specifications require the emission control devices to be compatible with existing EDG systems at the LNG terminal, with a capacity to meet the latest environmental standards. The devices should be robust, corrosion-resistant, and capable of operating under the specific temperature and pressure conditions of the site.

ParameterSpecification
MaterialHigh-grade stainless steel or equivalent
EfficiencyMinimum 95% removal of NOx and SOx gases
Power SupplyAs per site requirements
Control SystemAutomated, remote monitoring capable
InstallationModular design for ease of erection
The process involves detailed technical review, followed by procurement, installation, and rigorous testing to ensure compliance and operational efficiency.

Financial Requirements

The project budget is estimated within a range of Rs. 2 crore to Rs. 3 crore, inclusive of all costs related to design, procurement, installation, and commissioning. The financial breakdown is as follows:

Cost ComponentEstimated Cost (Rs.)
Design & Engineering15%
Equipment & Materials50%
Installation & Erection25%
Testing & Commissioning10%
Payment terms are typically linked to project milestones, with 10% advance, 40% upon equipment delivery, 40% after installation completion, and remaining 10% post-commissioning approval. All payments are subject to submission of necessary documentation and certification as per contractual terms.

Bidding Process

The bidding process involves the following steps:

  1. Download and review the tender documents from the official portal.
  2. Attend pre-bid meeting (if scheduled) for clarifications.
  3. Submit bid electronically through the designated portal before the deadline.
  4. Bid evaluation will be conducted in stages: primary, technical, and financial.
  5. Shortlisted bidders will be invited for negotiations or clarifications.
  6. Award of contract will be announced post-evaluation.
Key DatesDetails
Bid Submission Start31-05-2025 14:00
Bid Submission End30-07-2025 17:00
Tender Opening30-07-2025 17:15 (Primary), 17:30 (Technical), 17:45 (Priced)
**Important:** Bidders must ensure all documents are complete and submitted before the deadline to avoid disqualification.

Evaluation Criteria

Evaluation will be based on a combination of technical competence and financial competitiveness. The scoring criteria are:

CriteriaMaximum ScoreWeightage
Technical Proposal7070%
Financial Bid3030%
Factors considered include: - Experience in emission control projects - Technical compliance and innovation - Cost competitiveness - Delivery schedule - Past performance and certifications

Minimum qualifying marks in technical evaluation are 50%. The final award will be based on the highest combined score, with a focus on quality, compliance, and cost-effectiveness.

Important Dates

DateEventDetails
31-05-2025Bid Submission StartOpening of bid submission portal at 14:00
30-07-2025Bid Submission EndLast date for bid submission at 17:00
30-07-2025Bid OpeningPrimary evaluation at 17:15, technical at 17:30, priced bid at 17:45
15-08-2025Contract AwardExpected date for contract award (subject to change)
All deadlines are strict, and late submissions will not be entertained.

Contact Information

For queries and clarifications, bidders can contact:

GSPC LNG Limited

  • Contact Person: Sanjay Sengupta
  • Email: sanjaysengupta@gspc.in
  • Address: B-103, 1st floor, IT Tower 2, Infocity, Gandhinagar 382009
  • Phone: +91-79-40007517, 40007514, 40007515

Support for online bid submission and technical assistance is available through the (n)Code Solutions support team:

  • Email: nprocure@ncode.in
  • Phone: +91-79-40007517, 40007514, 40007515
  • Support Office: GNFC Infotower, S.G. Road, Bodakdev, Ahmedabad, Gujarat.

Additional Information

Bidders are advised to thoroughly review the tender documents, including civil drawings and technical specifications available for download. Participation requires a valid Digital Certificate for electronic signing. A free vendor training session is organized every Saturday at (n)Code Solutions office. All terms and conditions, including payment schedules, project timelines, and compliance standards, are detailed in the tender documents. Ensure compliance with all eligibility and technical criteria to qualify for evaluation. The project offers an excellent opportunity for experienced EPC contractors in emission control and LNG infrastructure projects to contribute to environmental sustainability and infrastructure development in Gujarat.

Industry & Sector Information

Primary Industry

Environmental Engineering & Infrastructure

Sectors

Public Sector Undertakings

Related Industries

Oil & Gas
Industrial Equipment Supply
Environmental Solutions

Target Audience

EPC Contractors specializing in emission control systems
Environmental Technology Providers
Engineering Consulting Firms
Industrial Equipment Suppliers
LNG Infrastructure Developers

General Information

Item Category
Supply,erection and Commissioning
State

Financial Information

EMD Amount
₹2,50,000.00
Bid Offer Validity
180 Days

Evaluation and Technical Information

Inspection Required
No

Tender Documents

4 Documents
Bidding Document.pdfTENDER_DOCUMENT
Civil Drawings.pdfTENDER_DOCUMENT
Other drawings documents.pdfTENDER_DOCUMENT
Pre-Bid Meeting Link .docxTENDER_DOCUMENT

Tender Stages

Tender Stages

stage nameevaluation dateminimum forms for submission
Primary30-07-2025 17:150
Technical30-07-2025 17:300
Priced bid30-07-2025 17:450

Frequently Asked Questions

The bid submission deadline is 30th July 2025 at 17:00 hours. Bidders must ensure all documents are uploaded before this time, as late submissions will not be accepted.

Bidders must submit valid bid fees and EMD, demonstrate experience in emission control projects, possess relevant certifications, and meet financial stability requirements. All necessary documents are detailed in the tender guidelines.

Participants must download the tender documents from the official portal, attend the pre-bid meeting if scheduled, and submit their bids electronically via the nProcure platform before the deadline. Digital certificates are mandatory for signing bids.

Devices must meet efficiency standards of at least 95% removal of NOx and SOx gases, be corrosion-resistant, and compatible with existing LNG terminal systems. Detailed specifications are provided in the tender documents.

The estimated project cost ranges between Rs. 2 crore and Rs. 3 crore, covering design, supply, installation, and commissioning, with detailed financial breakdowns available in the tender documentation.