Tender for Providing and Applying Fogging Treatment at GSECL Sikka Power Plant

Providing and Applying fogging treatment in plant premises and new colony at GSECL Sikka TPS.

Type: Works
Fee: ₹885
Est: ₹5.1 Lakh
Period: 18  Months

Tender Details

  • Chief Engineer, Gujarat State Electricity Corporation Ltd., Thermal Power Station, Sikka - 361 140
  • Submission Start:June 6, 2025 at 05:00 PM
  • Document Download End:June 26, 2025 at 06:00 PM
Industry: Power and Energy
Category: Works
Type: Works
Est:5.1 Lakh
Period: 18  Months

This government tender offers an opportunity for qualified civil contractors and power sector specialists to execute civil works and fogging treatment installation at GSECL Sikka Thermal Power Station. The project aims to improve plant hygiene, dust suppression, and microbial control through specialized fogging systems. The scope includes civil foundation work, equipment installation, and system testing, with a project duration of 18 months. Bidders must meet strict eligibility criteria, submit technical and financial proposals, and adhere to detailed terms and conditions. The tender process involves multiple evaluation stages to ensure transparency and quality. Funding is provided by the Gujarat State Electricity Corporation Ltd., emphasizing power sector development and environmental safety. Interested companies should review the comprehensive tender documentation, including technical specifications, eligibility requirements, and submission deadlines, available on the official portal. This is a strategic opportunity for experienced civil and industrial service providers aiming to contribute to sustainable power infrastructure projects.

Overview

This government tender invites qualified contractors to undertake civil works for providing and applying fogging treatment at GSECL Sikka Thermal Power Station. The project aims to enhance plant safety and hygiene by implementing fogging solutions in plant premises and the new colony. The scope includes comprehensive civil construction, equipment installation, and fogging application. The project duration is 18 months, with a submission deadline of June 26, 2025. Bidders must meet eligibility criteria, submit technical and financial proposals, and comply with all specified terms and conditions. This opportunity is ideal for civil contractors, industrial service providers, and companies specializing in power plant maintenance and safety solutions. The tender process involves multiple stages, including preliminary, technical, and commercial evaluations, ensuring transparency and fairness. The project is funded by the Gujarat State Electricity Corporation Ltd., with a focus on power and energy sector development. Interested bidders should review detailed documentation, including tender notices, EMD requirements, and technical specifications, available on the official portal.

Scope of Work

The scope of work encompasses:

  • Design and construction of civil infrastructure for fogging equipment installation in plant premises and new colony.
  • Provision of all materials, labor, and equipment required for civil works.
  • Installation of fogging systems as per technical specifications.
  • Application of fogging treatment to control dust, insects, and microbial growth.

The process involves:

  1. Site assessment and survey.
  2. Preparation of civil foundations and structures.
  3. Installation of fogging machinery and piping.
  4. Testing and commissioning of fogging systems.
  5. Training plant personnel on system operation.
SpecificationDetails
Completion Period18 months
Civil Work CategoryPower Plant Civil Works
Project LocationGSECL Sikka Thermal Power Station
Contract TypeWorks
All work must adhere to safety standards and technical guidelines provided in the tender documents.

Eligibility Criteria

Bidders must fulfill the following eligibility criteria:

  • ✓ Must have valid registration and licenses for civil construction and power plant civil works.
  • ✓ Must submit Tender Fee of ₹885 and EMD of ₹5120, payable via bank guarantee or online payment.
  • ✓ Proven experience in executing similar civil projects within power plants or industrial facilities.
  • ✓ Financial stability with average annual turnover of at least ₹5,00,000 in the last 3 years.
  • ✓ Must provide technical certifications, including Certificate-A and proof of Blacklist clearance.
  • ✓ Submit all required documents for preliminary and technical stages, including party details, bid confirmation, and tender documents.
Financial QualificationMinimum Average Annual Turnover₹5,00,000
Experience in Civil WorksProjects of similar scopeAt least 2 projects
CertificationValid technical and legal certificatesRequired
**Note:** Non-compliance with eligibility criteria will lead to disqualification.

Technical Specifications

The technical specifications include:

ParameterRequirement
Civil Work TypeFoundations, structural supports, piping channels
Material StandardsIS codes compliant, durable and corrosion-resistant
Fogging EquipmentHigh-pressure nozzles, pumps, and piping
Installation ProcedureSequential site preparation, equipment setup, testing
System TestingPressure tests, operational tests, safety checks
The process involves:
  • Conducting site surveys.
  • Preparing civil foundations.
  • Installing fogging systems as per drawings.
  • Conducting system tests and commissioning.
  • Providing training and documentation to plant staff.

Financial Requirements

The estimated project cost is approximately ₹5,11,979.40, with the following cost breakdown:

Cost ComponentAmount (₹)
Civil Works3,00,000
Equipment & Materials1,50,000
Labor & Installation60,000
Miscellaneous & Contingencies1,19,979.40
Payment terms are as follows: - 10% advance at contract signing. - 40% after completion of civil foundation. - 30% post installation and testing. - 20% upon project completion and approval.

All payments are subject to submission of valid invoices and compliance with contractual milestones.

Bidding Process

The bidding process involves the following steps:

  1. Download tender documents from the official portal.
  2. Submit the Tender Fee and EMD within the specified deadline.
  3. Attend pre-bid meetings if scheduled.
  4. Submit technical and financial bids electronically before the closing date.
  5. Technical evaluation will be conducted on July 5, 2025.
  6. Commercial evaluation will follow on July 6, 2025.
  7. Final award will be announced after approval.
MilestoneDate
Tender Submission Deadline26-06-2025 18:00
Technical Evaluation05-07-2025 15:30
Commercial Evaluation06-07-2025 15:40
**Important:** Bidders must ensure all documents are complete and submitted within the stipulated timelines.

Evaluation Criteria

Evaluation will be based on:

CriteriaWeightage
Technical Capability50%
Past Experience20%
Financial Stability15%
Price Competitiveness15%
Minimum qualifying scores are: - **Technical Capability**: 70% - **Financial Stability**: Satisfactory proof of turnover and assets

Bidders must meet all minimum thresholds to qualify for the award. The evaluation will consider quality, experience, cost, and compliance with technical specifications.

Important Dates

DateEventDetails
06-06-2025Bid Submission StartBidders can start submitting bids online
26-06-2025Bid Submission EndLast date for bid submission at 18:00
05-07-2025Technical EvaluationEvaluation of technical bids at 15:30
06-07-2025Commercial EvaluationCommercial bid review at 15:40
07-07-2025Contract AwardExpected date for contract signing
**Note:** All deadlines are strict; late submissions will be rejected.

Contact Information

Chief Engineer, Gujarat State Electricity Corporation Ltd.

Contact PersonPhoneEmail
Chief Engineer7567047231nprocure@ncode.in
**Address:** Chief Engineer, Gujarat State Electricity Corporation Ltd., Thermal Power Station, Sikka - 361 140, Jamnagar, Gujarat.

For queries and support, contact during working hours or email for detailed assistance.

Additional Information

All bidders are advised to carefully review the tender documents available on the official portal. A free vendor training session will be held every Saturday from 4:00 to 5:00 PM at (n)Code Solutions, Ahmedabad, to assist bidders in understanding the online bidding process. Bidders must procure a valid Digital Certificate for electronic signing. The project emphasizes transparency, quality, and timely completion. Ensure compliance with all technical, financial, and legal requirements to participate successfully.

Industry & Sector Information

Primary Industry

Power and Energy

Sectors

Power Sector
Government Infrastructure

Related Industries

Civil Construction
Industrial Equipment Installation
Environmental Safety Solutions

Target Audience

Civil construction companies specializing in power plant infrastructure
Industrial safety and environmental control service providers
Power plant maintenance contractors
Electrical and mechanical equipment installers
Environmental safety solution providers

General Information

Item Category
Civil Works
State

Financial Information

Estimated Bid Value
₹5,11,979.40
EMD Amount
₹5,120.00
Bid Offer Validity
180 Days

Evaluation and Technical Information

Inspection Required
No

Tender Documents

4 Documents
EMD BG Format (New).pdfTENDER_DOCUMENT
Financial Document_Annexure - I.pdfTENDER_DOCUMENT
STPS_390_02_71887_050625 Civil.pdfTENDER_DOCUMENT
E TENDER NOTICE NO. 390.docTENDER_DOCUMENT

Tender Stages

Tender Stages

stage nameevaluation dateminimum forms for submission
Preliminary Stage05-07-2025 15:300
Technical Stage05-07-2025 15:350
Commercial Stage06-07-2025 15:400

Frequently Asked Questions

This tender involves civil construction, installation, and application of fogging systems at GSECL Sikka Thermal Power Station. The scope includes site assessment, civil foundation work, equipment installation, testing, and commissioning to enhance plant hygiene and safety.

Eligible bidders must have valid civil construction licenses, experience in power plant projects, and financial stability. They must submit all required documents, including tender fee, EMD, technical certifications, and experience proof. Refer to the eligibility criteria section for detailed requirements.

The bid submission opens on 6th June 2025 at 5:00 PM and closes on 26th June 2025 at 6:00 PM. Technical evaluation will be conducted on 5th July 2025, followed by commercial evaluation on 6th July 2025. Ensure timely submission to avoid disqualification.

The fogging system must include high-pressure nozzles, pumps, and piping compliant with IS standards. Installation involves site survey, foundation preparation, equipment setup, and testing. The system should be capable of dust suppression and microbial control, with safety and durability as priorities.

Bids are evaluated based on technical capability (50%), experience (20%), financial stability (15%), and price competitiveness (15%). Minimum thresholds must be met in each category. The highest scoring compliant bid will be awarded the contract.

Probable Bidders

Companies likely to bid

Get Tender Alerts

Get notifications for similar tenders