Tender for Providing and Applying Fogging Treatment at GSECL Sikka Power Plant
Providing and Applying fogging treatment in plant premises and new colony at GSECL Sikka TPS.
Tender Details
- Chief Engineer, Gujarat State Electricity Corporation Ltd., Thermal Power Station, Sikka - 361 140
- Submission Start:June 6, 2025 at 05:00 PM
- Document Download End:June 26, 2025 at 06:00 PM
This government tender offers an opportunity for qualified civil contractors and power sector specialists to execute civil works and fogging treatment installation at GSECL Sikka Thermal Power Station. The project aims to improve plant hygiene, dust suppression, and microbial control through specialized fogging systems. The scope includes civil foundation work, equipment installation, and system testing, with a project duration of 18 months. Bidders must meet strict eligibility criteria, submit technical and financial proposals, and adhere to detailed terms and conditions. The tender process involves multiple evaluation stages to ensure transparency and quality. Funding is provided by the Gujarat State Electricity Corporation Ltd., emphasizing power sector development and environmental safety. Interested companies should review the comprehensive tender documentation, including technical specifications, eligibility requirements, and submission deadlines, available on the official portal. This is a strategic opportunity for experienced civil and industrial service providers aiming to contribute to sustainable power infrastructure projects.
Overview
This government tender invites qualified contractors to undertake civil works for providing and applying fogging treatment at GSECL Sikka Thermal Power Station. The project aims to enhance plant safety and hygiene by implementing fogging solutions in plant premises and the new colony. The scope includes comprehensive civil construction, equipment installation, and fogging application. The project duration is 18 months, with a submission deadline of June 26, 2025. Bidders must meet eligibility criteria, submit technical and financial proposals, and comply with all specified terms and conditions. This opportunity is ideal for civil contractors, industrial service providers, and companies specializing in power plant maintenance and safety solutions. The tender process involves multiple stages, including preliminary, technical, and commercial evaluations, ensuring transparency and fairness. The project is funded by the Gujarat State Electricity Corporation Ltd., with a focus on power and energy sector development. Interested bidders should review detailed documentation, including tender notices, EMD requirements, and technical specifications, available on the official portal.
Scope of Work
The scope of work encompasses:
- Design and construction of civil infrastructure for fogging equipment installation in plant premises and new colony.
- Provision of all materials, labor, and equipment required for civil works.
- Installation of fogging systems as per technical specifications.
- Application of fogging treatment to control dust, insects, and microbial growth.
The process involves:
- Site assessment and survey.
- Preparation of civil foundations and structures.
- Installation of fogging machinery and piping.
- Testing and commissioning of fogging systems.
- Training plant personnel on system operation.
Specification | Details |
---|---|
Completion Period | 18 months |
Civil Work Category | Power Plant Civil Works |
Project Location | GSECL Sikka Thermal Power Station |
Contract Type | Works |
Eligibility Criteria
Bidders must fulfill the following eligibility criteria:
- ✓ Must have valid registration and licenses for civil construction and power plant civil works.
- ✓ Must submit Tender Fee of ₹885 and EMD of ₹5120, payable via bank guarantee or online payment.
- ✓ Proven experience in executing similar civil projects within power plants or industrial facilities.
- ✓ Financial stability with average annual turnover of at least ₹5,00,000 in the last 3 years.
- ✓ Must provide technical certifications, including Certificate-A and proof of Blacklist clearance.
- ✓ Submit all required documents for preliminary and technical stages, including party details, bid confirmation, and tender documents.
Financial Qualification | Minimum Average Annual Turnover | ₹5,00,000 |
---|---|---|
Experience in Civil Works | Projects of similar scope | At least 2 projects |
Certification | Valid technical and legal certificates | Required |
Technical Specifications
The technical specifications include:
Parameter | Requirement |
---|---|
Civil Work Type | Foundations, structural supports, piping channels |
Material Standards | IS codes compliant, durable and corrosion-resistant |
Fogging Equipment | High-pressure nozzles, pumps, and piping |
Installation Procedure | Sequential site preparation, equipment setup, testing |
System Testing | Pressure tests, operational tests, safety checks |
- Conducting site surveys.
- Preparing civil foundations.
- Installing fogging systems as per drawings.
- Conducting system tests and commissioning.
- Providing training and documentation to plant staff.
Financial Requirements
The estimated project cost is approximately ₹5,11,979.40, with the following cost breakdown:
Cost Component | Amount (₹) |
---|---|
Civil Works | 3,00,000 |
Equipment & Materials | 1,50,000 |
Labor & Installation | 60,000 |
Miscellaneous & Contingencies | 1,19,979.40 |
All payments are subject to submission of valid invoices and compliance with contractual milestones.
Bidding Process
The bidding process involves the following steps:
- Download tender documents from the official portal.
- Submit the Tender Fee and EMD within the specified deadline.
- Attend pre-bid meetings if scheduled.
- Submit technical and financial bids electronically before the closing date.
- Technical evaluation will be conducted on July 5, 2025.
- Commercial evaluation will follow on July 6, 2025.
- Final award will be announced after approval.
Milestone | Date |
---|---|
Tender Submission Deadline | 26-06-2025 18:00 |
Technical Evaluation | 05-07-2025 15:30 |
Commercial Evaluation | 06-07-2025 15:40 |
Evaluation Criteria
Evaluation will be based on:
Criteria | Weightage |
---|---|
Technical Capability | 50% |
Past Experience | 20% |
Financial Stability | 15% |
Price Competitiveness | 15% |
Bidders must meet all minimum thresholds to qualify for the award. The evaluation will consider quality, experience, cost, and compliance with technical specifications.
Important Dates
Date | Event | Details |
---|---|---|
06-06-2025 | Bid Submission Start | Bidders can start submitting bids online |
26-06-2025 | Bid Submission End | Last date for bid submission at 18:00 |
05-07-2025 | Technical Evaluation | Evaluation of technical bids at 15:30 |
06-07-2025 | Commercial Evaluation | Commercial bid review at 15:40 |
07-07-2025 | Contract Award | Expected date for contract signing |
Contact Information
Chief Engineer, Gujarat State Electricity Corporation Ltd.
Contact Person | Phone | |
---|---|---|
Chief Engineer | 7567047231 | nprocure@ncode.in |
For queries and support, contact during working hours or email for detailed assistance.
Additional Information
All bidders are advised to carefully review the tender documents available on the official portal. A free vendor training session will be held every Saturday from 4:00 to 5:00 PM at (n)Code Solutions, Ahmedabad, to assist bidders in understanding the online bidding process. Bidders must procure a valid Digital Certificate for electronic signing. The project emphasizes transparency, quality, and timely completion. Ensure compliance with all technical, financial, and legal requirements to participate successfully.
Industry & Sector Information
Primary Industry
Sectors
Related Industries
Target Audience
Tender Documents
4 DocumentsTender Stages
Tender Stages
stage name | evaluation date | minimum forms for submission |
---|---|---|
Preliminary Stage | 05-07-2025 15:30 | 0 |
Technical Stage | 05-07-2025 15:35 | 0 |
Commercial Stage | 06-07-2025 15:40 | 0 |
Similar Tenders
Frequently Asked Questions
This tender involves civil construction, installation, and application of fogging systems at GSECL Sikka Thermal Power Station. The scope includes site assessment, civil foundation work, equipment installation, testing, and commissioning to enhance plant hygiene and safety.
Eligible bidders must have valid civil construction licenses, experience in power plant projects, and financial stability. They must submit all required documents, including tender fee, EMD, technical certifications, and experience proof. Refer to the eligibility criteria section for detailed requirements.
The bid submission opens on 6th June 2025 at 5:00 PM and closes on 26th June 2025 at 6:00 PM. Technical evaluation will be conducted on 5th July 2025, followed by commercial evaluation on 6th July 2025. Ensure timely submission to avoid disqualification.
The fogging system must include high-pressure nozzles, pumps, and piping compliant with IS standards. Installation involves site survey, foundation preparation, equipment setup, and testing. The system should be capable of dust suppression and microbial control, with safety and durability as priorities.
Bids are evaluated based on technical capability (50%), experience (20%), financial stability (15%), and price competitiveness (15%). Minimum thresholds must be met in each category. The highest scoring compliant bid will be awarded the contract.
Probable Bidders
Get Tender Alerts
Get notifications for similar tenders